356
edits
m (cleanup) |
|||
Line 13: | Line 13: | ||
As of June 1, 2008, the following items have been completed: | As of June 1, 2008, the following items have been completed: | ||
* Belly fairing has been completed. | * Belly fairing has been completed. | ||
* | * Cutouts for doors and windows have been completed. | ||
* Horizontal and vertical stabilizers have taken shape, and work on control surfaces can be started at any time. | * Horizontal and vertical stabilizers have taken shape, and work on control surfaces can be started at any time. | ||
* The basic shape of the wings is done, along with the winglets. | * The basic shape of the wings is done, along with the winglets. | ||
Line 22: | Line 22: | ||
'''Exterior:''' | '''Exterior:''' | ||
* Control surfaces are awaiting to be cut. | * Control surfaces are awaiting to be cut. | ||
* Engine nacelles and pylons needed to be created. | * Engine nacelles and pylons needed to be created. | ||
* Fillets and Chamfers will be needed for the joins between the vertical stabilizer and the tail cone. | * Fillets and Chamfers will be needed for the joins between the vertical stabilizer and the tail cone. |
edits