3,032
edits
(update) |
No edit summary |
||
Line 16: | Line 16: | ||
Boeing featured its first 787 in a rollout ceremony on July 8, 2007 at its assembly factory in Everett, Washington, by which time it had become the fastest-selling wide body airliner in history with nearly 600 orders. Originally scheduled to enter service in May 2008, production has been delayed and it is currently scheduled to enter into service in late 2009. | Boeing featured its first 787 in a rollout ceremony on July 8, 2007 at its assembly factory in Everett, Washington, by which time it had become the fastest-selling wide body airliner in history with nearly 600 orders. Originally scheduled to enter service in May 2008, production has been delayed and it is currently scheduled to enter into service in late 2009. | ||
==Related content== | ==Related content== | ||
Line 26: | Line 25: | ||
*[[FlightGear 1.0 default aircraft]] | *[[FlightGear 1.0 default aircraft]] | ||
{{boeing}} | |||
edits