Airports under construction: Difference between revisions

Jump to navigation Jump to search
no edit summary
mNo edit summary
No edit summary
Line 67: Line 67:
|KSFO||karla|| ||x|| ||2010-08-06 ||2010-08-27 ||Terminal 2 fully remodelled; new day and night textures; new light masts; jetways included; actual T2 under reconstruction 2010; available as direct download (see forum) or on Git/Git
|KSFO||karla|| ||x|| ||2010-08-06 ||2010-08-27 ||Terminal 2 fully remodelled; new day and night textures; new light masts; jetways included; actual T2 under reconstruction 2010; available as direct download (see forum) or on Git/Git
|-
|-
|LHPP||sztamas6||x||||||2011-11-02|| || Changin generic taxiways to realistic ones. Adding paved and unpaved aprons. Moving tower position to actual location
|-
|LSMA||gral||x||||||2010-04-12||2010-04-12||runways, taxiways, tower position, atc freqs
|LSMA||gral||x||||||2010-04-12||2010-04-12||runways, taxiways, tower position, atc freqs
|-
|-
1

edit

Navigation menu