Orio al Serio Airport: Difference between revisions

Jump to navigation Jump to search
m
Robot: Cosmetic changes
m (Robot: Cosmetic changes)
Line 30: Line 30:


=== About the project ===
=== About the project ===
The project has started with the additions of taxiways and aprons (which were missing on FG 1.9.1) with taxydraw, and the subsequent run of Terrragear.
The project has started with the additions of taxiways and aprons (which were missing on FG 1.9.1) with taxydraw, and the subsequent run of Terrragear.
   
   
Presently (sept 2010), the following buildings have been modeled:
Presently (sept 2010), the following buildings have been modeled:

Navigation menu