North American P-51 Mustang: Difference between revisions

Jump to navigation Jump to search
Line 153: Line 153:
* Plumbing for landing gear door hydraulics _ done.
* Plumbing for landing gear door hydraulics _ done.
* Landing light model - done. T316 T578, T579, T580, L276, Q590, Q548, T626, P562, J890 - J892, T84
* Landing light model - done. T316 T578, T579, T580, L276, Q590, Q548, T626, P562, J890 - J892, T84
* Center wing gap cover - done. S48
==== To-do list ====
==== To-do list ====
* Detail work on the wheel wells remains.
* Detail work on the wheel wells remains.
** Ribs missing in wheel well.
** Ribs missing in wheel well.
*** Station 29.25 K524 & K525 called out by index but not the rib?
*** Station 29.25 R39
** Main landing gear trunnion needs to be modeled. R18.
** Main landing gear trunnion needs to be modeled. R18.
** mounting bracket for main gear tract hydraulics strut.
** mounting bracket for main gear strut hydraulics strut.
** Hydraulic lines for main retract strut.
** Hydraulic lines for main retract strut.
** Connecting rod main gear retract hydraulics strut.
** Connecting rod main gear retract hydraulics strut.
** Center wing gap cover. S48
 


On the right are some screen shots of the WIP models.
On the right are some screen shots of the WIP models.
167

edits

Navigation menu