Leipzig/Halle Airport: Difference between revisions

Jump to navigation Jump to search
(→‎Luggage terminal: new details)
Line 73: Line 73:


==== Luggage terminal ====
==== Luggage terminal ====
This building is finished. The old version was replaced in December 2012.
This building was first published in 2004 and remodelled by Thomas Großberger in 2012. The terminal is connected via the old tower next to it to terminal A by a tube, which is used to transport luggage between the checkin- and arrival-area and Apron 1. Both. the connection and the old tower building will be modelled in 2013. The new luggage terminal in FlightGear is offering:
* realistic roof design
* simplified but detailed interior
* 6 clock controlled automatic gates
* complex light design (Rembrandt-Design outstanding)


==== GAT ====
==== GAT ====
258

edits

Navigation menu