Leipzig/Halle Airport: Difference between revisions

Jump to navigation Jump to search
DHL tanks published
m (→‎Development: progressbars)
(DHL tanks published)
Line 137: Line 137:




'''Scenery in TerraSync:''' The hub (warehouse, hangar and aprons) is modelled in the scenery. In 2012 its redesign for TerraSync started. First all lampposts at apron 4 had been replaced with those which fit into the correct layout of every single parking position. Afterwards lots of goods and ground vehicles where placed. As soon as some missing storage buildings are modelled, the new content of apron 4 will be published on TerraSync. Last modifications will take place when the new [[Airport data (apt.dat) update|850-standard layout]] of EDDP will be created in the future.
[[File:EDDP-DHL-tank.jpeg|thumb|270px|DHL-Tank at fuel storage area on apron 4]]'''Scenery in TerraSync:''' The hub (warehouse, hangar and aprons) is modelled in the scenery. In 2012 its redesign for TerraSync started. First all lampposts at apron 4 had been replaced with those which fit into the correct layout of every single parking position. Afterwards lots of goods and ground vehicles where placed. As soon as some missing storage buildings are modelled, the new content of apron 4 will be published on TerraSync. Last modifications will take place when the new [[Airport data (apt.dat) update|850-standard layout]] of EDDP will be created in the future.


'''DHL-hub at EDDP in Flightgear:''' Leipzig/Halle Airport offers ground space for more than 70 Boeing [[757-200|757-PF]] or up to 50 [[777F]] as well as space for 10 [[Antonov An-124|An-124]] at Apron 2, 4 and 5. Airmail flights can be flown from and to EDDP. One of the middle sized and highly connected hubs of DHL, the [[Orio al Serio Airport]] (Italy) is also modelled in FlightGear and can be used for realistic flights out of Leipzig/Halle Airport.  
'''DHL-hub at EDDP in Flightgear:''' Leipzig/Halle Airport offers ground space for more than 70 Boeing [[757-200|757-PF]] or up to 50 [[777F]] as well as space for 10 [[Antonov An-124|An-124]] at Apron 2, 4 and 5. Airmail flights can be flown from and to EDDP. One of the middle sized and highly connected hubs of DHL, the [[Orio al Serio Airport]] (Italy) is also modelled in FlightGear and can be used for realistic flights out of Leipzig/Halle Airport.  
In FlighGear apron 4 is equipped with all stands. Additionally to the main apron lightning each stand has one centred lamppost, which will be replaced by a VDGS-signs in the future. Ground markings will come with the new 850-layout. The major storage buildings from DHL are modelled as well as three DHL-tanks south from apron 4.


=== De-icing areas ===
=== De-icing areas ===
Line 167: Line 168:
=== Download via TerraSync ===
=== Download via TerraSync ===
[[TerraSync]] has it all! There is no custom scenery existing. The authors believe on the advantages of TerraSync which makes it easy for every user always to have the latest scenery installed automatically. Updates during redesigning process in 2012 are published every week on TerraSync.
[[TerraSync]] has it all! There is no custom scenery existing. The authors believe on the advantages of TerraSync which makes it easy for every user always to have the latest scenery installed automatically. Updates during redesigning process in 2012 are published every week on TerraSync.
* Next update in '''<daysuntil in="days">28-October-2012</daysuntil>'''
* Next update in '''<daysuntil in="days">29-October-2012</daysuntil>'''
* '''Latest update on TerraSync:'''
* '''Latest update on TerraSync:'''
** '''2012-09-20''' ''new VisualGuidingDockingSystem at terminal B''
** '''2012-10-22''' ''three new DHL-tanks placed at DHL-area''
 
* Last five updates:
* Last five updates:
** 2012-09-20 ''new VisualGuidingDockingSystem at terminal B''
** 2012-08-30 ''new terminal C published''
** 2012-08-30 ''new terminal C published''
** 2012-08-19 ''redesigned infrastructure of DHL-area''
** 2012-08-19 ''redesigned infrastructure of DHL-area''
** 2012-08-14 ''new lightning of all three taxiway bridges''
** 2012-08-14 ''new lightning of all three taxiway bridges''
** 2012-08-05 ''new infrastructure on both de-icing areas''
** 2012-08-05 ''new infrastructure on both de-icing areas''
** 2012-07-21 ''new infrastructure, static air-planes and ground vehicles added to apron 1


=== Development ===
=== Development ===
Line 186: Line 188:
'''Scenery (Shared Models)'''<br />
'''Scenery (Shared Models)'''<br />
* Airport lightning: more than 80 lampposts ([[EDDM]]-model) on Apron 1 and 4 and both northern de-icing areas ''(published 07/2012)'' {{tick}}
* Airport lightning: more than 80 lampposts ([[EDDM]]-model) on Apron 1 and 4 and both northern de-icing areas ''(published 07/2012)'' {{tick}}
* DHL-tanks at apron 4 ''(published 10/2012)'' {{tick}}
* Ground traffic: lots of goods and vehicles (shared) make apron 1 and 4 much more realistic ''(published 08/2012)'' {{tick}}
* Ground traffic: lots of goods and vehicles (shared) make apron 1 and 4 much more realistic ''(published 08/2012)'' {{tick}}
* Flora and boundaries: Trees and fences on Apron 1, 2 and 4 are added ''(published 08/2012)'' {{tick}}
* Flora and boundaries: Trees and fences on Apron 1, 2 and 4 are added ''(published 08/2012)'' {{tick}}
* New shared ground vehicles
** Container dolly ''(under development)'' {{progressbar|80}}
** Luggage dolly ''(under development)'' {{progressbar|40}}
** Pallet dolly ''(planned)''
* New shared Unit Load Devices (ULD)
** Airfreight container - Type AKH ''(pre-development)'' {{hourglass}}
** Airfreight pallet ''(planed)''
* Village and industrial surroundings: Kursdorf within the airport and industrial areas around are created with shared models ''(published 04/2010)'' {{tick}}
* Village and industrial surroundings: Kursdorf within the airport and industrial areas around are created with shared models ''(published 04/2010)'' {{tick}}


Line 194: Line 204:
* Cargo-center apron 2 ''(published 2010)'' {{tick}}  
* Cargo-center apron 2 ''(published 2010)'' {{tick}}  
* DHL-hangar ''(published 2010)'' {{tick}}
* DHL-hangar ''(published 2010)'' {{tick}}
* DHL-tanks ''(under development)'' {{progressbar|80}}
* DHL-terminal ''(published 2010)'' {{tick}}
* DHL-terminal ''(published 2010)'' {{tick}}
* Luggage terminal ''(under development)'' {{progressbar|90}}
* Luggage terminal ''(under development)'' {{progressbar|90}}
Line 216: Line 225:


=== Models since 2012 ===
=== Models since 2012 ===
[[File:EDDP TerminalC.jpeg|Terminal C]] [[File:EDDP VDGS-136 thumbnail.jpg|VDGS at position 136]]
[[File:EDDP TerminalC.jpeg|Terminal C]] [[File:EDDP VDGS-136 thumbnail.jpg|VDGS at position 136]] [[File:EDDP-DHL-tank.jpeg|DHL-Tank at fuel storage area on apron 4]]
=== Models since 2010 ===
=== Models since 2010 ===
Here is a selection of the models. [http://www.youtube.com/watch?v=3kNDGiSNUdE YouTube video 2010].
Here is a selection of the models. [http://www.youtube.com/watch?v=3kNDGiSNUdE YouTube video 2010].
258

edits

Navigation menu