Leipzig/Halle Airport: Difference between revisions

Jump to navigation Jump to search
m
ATC+
m (ATC+)
Line 2: Line 2:
|name = Leipzig/Halle Airport
|name = Leipzig/Halle Airport
|image =EDDP TerminalC.jpeg
|image =EDDP TerminalC.jpeg
|alt =
|alt =470 ft / 135 m
|iata =LEJ
|iata =LEJ
|icao =EDDP
|icao =EDDP
Line 31: Line 31:


==== Runway 08L/26R ====
==== Runway 08L/26R ====
[[File:2012-09 Apron4 Luftbild-at-night.png|thumb|Apron 4 and runway 26L at night]]The northern runway is 3600m long with a width of 45m. In real life its usually used by passenger airliners
[[File:2012-09 Apron4 Luftbild-at-night.png|thumb|Apron 4 and runway 26L at night]]The northern runway is 3600m long with a width of 45m. In real life its usually used by passenger airliners.
* ILS-CAT-III '''08L''' (083°): 108.55
* ILS-CAT-III '''08L''' (083°): 108.55
* ILS-CAT-III '''26R''' (263°): 108.35
* ILS-CAT-III '''26R''' (263°): 108.35
==== Runway 08R/26L ====
==== Runway 08R/26L ====
The southern runway is 3600m long with a width of 60m. In real life its mostly used by freighters due to its proximity to freight areas (Apron 2 and 4)
The southern runway is 3600m long with a width of 60m. In real life its mostly used by freighters due to its proximity to freight areas (Apron 2 and 4).
* ILS-CAT-III '''08R''' (083°): 111.90 (111.75 in FG older than Version 2.0.0)
* ILS-CAT-III '''08R''' (083°): 111.90 (111.75 in FG older than Version 2.0.0)
* ILS-CAT-III '''26L''' (263°): 110.30
* ILS-CAT-III '''26L''' (263°): 110.30
Line 44: Line 44:
* Leipzig Tower - frequency 121.100
* Leipzig Tower - frequency 121.100


Leipzig/Halle Airport is regularly served by Air Traffic Control ([[ATC]]).




Line 96: Line 97:
| Authors: ||
| Authors: ||
* Models: David G.  
* Models: David G.  
* Aiport layout: Christian Schmitt  
* Airport layout: Christian Schmitt  
* Additional models: Don Lavelle, Alex Park, Robert Shearman  
* Additional models: Don Lavelle, Alex Park, Robert Shearman  
* Redesigning & Development 2012: August Geyler, Thomas Großberger
* Redesigning & Development 2012: August Geyler, Thomas Großberger
Line 140: Line 141:
* Tower ''(published 2010)''  
* Tower ''(published 2010)''  
* Turbo engine hall ''(pre-development)''
* Turbo engine hall ''(pre-development)''
* Old Tower next to terminal B ''(pre-development)''
* Visual Docking Guiding System ''(published)''
* Visual Docking Guiding System ''(published)''


258

edits

Navigation menu