258
edits
m (→Development) |
m (ATC+) |
||
Line 2: | Line 2: | ||
|name = Leipzig/Halle Airport | |name = Leipzig/Halle Airport | ||
|image =EDDP TerminalC.jpeg | |image =EDDP TerminalC.jpeg | ||
|alt = | |alt =470 ft / 135 m | ||
|iata =LEJ | |iata =LEJ | ||
|icao =EDDP | |icao =EDDP | ||
Line 31: | Line 31: | ||
==== Runway 08L/26R ==== | ==== Runway 08L/26R ==== | ||
[[File:2012-09 Apron4 Luftbild-at-night.png|thumb|Apron 4 and runway 26L at night]]The northern runway is 3600m long with a width of 45m. In real life its usually used by passenger airliners | [[File:2012-09 Apron4 Luftbild-at-night.png|thumb|Apron 4 and runway 26L at night]]The northern runway is 3600m long with a width of 45m. In real life its usually used by passenger airliners. | ||
* ILS-CAT-III '''08L''' (083°): 108.55 | * ILS-CAT-III '''08L''' (083°): 108.55 | ||
* ILS-CAT-III '''26R''' (263°): 108.35 | * ILS-CAT-III '''26R''' (263°): 108.35 | ||
==== Runway 08R/26L ==== | ==== Runway 08R/26L ==== | ||
The southern runway is 3600m long with a width of 60m. In real life its mostly used by freighters due to its proximity to freight areas (Apron 2 and 4) | The southern runway is 3600m long with a width of 60m. In real life its mostly used by freighters due to its proximity to freight areas (Apron 2 and 4). | ||
* ILS-CAT-III '''08R''' (083°): 111.90 (111.75 in FG older than Version 2.0.0) | * ILS-CAT-III '''08R''' (083°): 111.90 (111.75 in FG older than Version 2.0.0) | ||
* ILS-CAT-III '''26L''' (263°): 110.30 | * ILS-CAT-III '''26L''' (263°): 110.30 | ||
Line 44: | Line 44: | ||
* Leipzig Tower - frequency 121.100 | * Leipzig Tower - frequency 121.100 | ||
Leipzig/Halle Airport is regularly served by Air Traffic Control ([[ATC]]). | |||
Line 96: | Line 97: | ||
| Authors: || | | Authors: || | ||
* Models: David G. | * Models: David G. | ||
* | * Airport layout: Christian Schmitt | ||
* Additional models: Don Lavelle, Alex Park, Robert Shearman | * Additional models: Don Lavelle, Alex Park, Robert Shearman | ||
* Redesigning & Development 2012: August Geyler, Thomas Großberger | * Redesigning & Development 2012: August Geyler, Thomas Großberger | ||
Line 140: | Line 141: | ||
* Tower ''(published 2010)'' | * Tower ''(published 2010)'' | ||
* Turbo engine hall ''(pre-development)'' | * Turbo engine hall ''(pre-development)'' | ||
* Old Tower next to terminal B ''(pre-development)'' | |||
* Visual Docking Guiding System ''(published)'' | * Visual Docking Guiding System ''(published)'' | ||
edits