FlightGear Newsletter August 2011: Difference between revisions

Jump to navigation Jump to search
Added an image of the ongoing AI/ATC interaction tests.
(Added an image of the ongoing AI/ATC interaction tests.)
Line 13: Line 13:


=== AI/ATC interactions ===
=== AI/ATC interactions ===
[[File:Ehamrwyblock.png|thumb| Heavily congested taxiways at Schiphol after the 777-200 had been blocking active runway 24 for nearly 4 hours.]]
While the preparations for our upcoming release are still going on, development for the next release has already started. In early august code changes were committed, which allow FlightGear users to interact with an artifically intelligent ATC system. Currently it is possible to request startup clearance, permission for push back, as well as taxi-clearances. A brand new, and highly experimental, ground network visualization system makes it possible to taxi from parking to runway along the route given by ATC. Hold position and resume taxi instructions can be be given in order to avoid collisions with other (AI controlled) aircraft. Hand-off to a tower controller, as well as more interactive take offs, are in the planning stages. The aim is to have all stages of IFR commercial aviation traffic under ATC control before the release of flightgear 2.6.0, which is planned for early 2012.
While the preparations for our upcoming release are still going on, development for the next release has already started. In early august code changes were committed, which allow FlightGear users to interact with an artifically intelligent ATC system. Currently it is possible to request startup clearance, permission for push back, as well as taxi-clearances. A brand new, and highly experimental, ground network visualization system makes it possible to taxi from parking to runway along the route given by ATC. Hold position and resume taxi instructions can be be given in order to avoid collisions with other (AI controlled) aircraft. Hand-off to a tower controller, as well as more interactive take offs, are in the planning stages. The aim is to have all stages of IFR commercial aviation traffic under ATC control before the release of flightgear 2.6.0, which is planned for early 2012.


117

edits

Navigation menu