Flying the Shuttle - Launch And Post Insertion Advanced: Difference between revisions

Jump to navigation Jump to search
Line 410: Line 410:




We want first to Freeze dried the GPC 3.To do so, we need to be in OPS 0 ( System Application only)
We want first to Freeze dried the GPC 3.To do so, we need to be in OPS 0 ( System Application only)<br />
 
Problem is: It is still in the common set, and if we switch to OPS 0 in GPC3, the GPC 1,2 and 4 will be moved to OPS 0 also
Problem is: It is still in the common set, and if we switch to OPS 0 in GPC3, the GPC 1,2 and 4 will be moved to OPS 0 also
So we need to switch off the communications between GPC 3 and the differents buses linked to him ( Flight criticals -FF-, and the one from central IDP/CRT )
So we need to switch off the communications between GPC 3 and the differents buses linked to him ( Flight criticals -FF-, and the one from central IDP/CRT )<br />
 




842

edits

Navigation menu