Release plan: Difference between revisions

m
Line 73: Line 73:
=== Definition of repository states ===
=== Definition of repository states ===
* Open/Green
* Open/Green
: Normal development of the code base and fgdata. Unrestricted (well, sort of) access to the streams. This state lasts for five month after the release branches were created.
*:Normal development of the code base and fgdata. Unrestricted (well, sort of) access to the streams. This state lasts for five month after the release branches were created.
* Frozen/Yellow
* Frozen/Yellow
*:No new features or major changes shall be pushed onto the development streams (neither source nor data). This period is for preparing the code for the release and make sure there are no major issues. It lasts for four weeks until creation of the release branches.
*:No new features or major changes shall be pushed onto the development streams (neither source nor data). This period is for preparing the code for the release and make sure there are no major issues. It lasts for four weeks until creation of the release branches.
159

edits