Airbus A340: Difference between revisions

84 bytes removed ,  3 September 2008
Line 11: Line 11:
== Development status/Issues/Todo ==
== Development status/Issues/Todo ==
=== Status ===
=== Status ===
As of July 1, 2008, the following items have been completed:
As of September 1, 2008, the following items have been completed:
* Belly fairing has been completed.
* Belly fairing has been completed.
* Cutouts for doors and windows have been completed.
* Cutouts for doors and windows have been completed.
* Horizontal and vertical stabilizers have taken shape, and work on control surfaces can be started at any time.
* Horizontal and vertical stabilizers have taken shape, and work on control surfaces can be started at any time.
* The basic shape of the wings is done, along with the winglets.
* The basic shape of the wings is done, along with the winglets.
* Control surfaces have been cut.
* Engine nacelles and pylons are somewhat completed.
* Flap track fairings are mostly completed.


In the cockpit, instruments on the front panel as well as the pedestal have mostly been completed.
In the cockpit, instruments on the front panel as well as the pedestal have mostly been completed.
Line 21: Line 24:
=== Todo ===
=== Todo ===
'''Exterior:'''
'''Exterior:'''
* Control surfaces are awaiting to be cut.
* Engine nacelles and pylons needed to be created.
* Fillets and Chamfers will be needed for the joins between the vertical stabilizer and the tail cone.
* Flap track fairings.
* Landing gears needed to be created.
* Landing gears needed to be created.


356

edits