Airbus A340: Difference between revisions

m (cleanup)
Line 13: Line 13:
As of June 1, 2008, the following items have been completed:
As of June 1, 2008, the following items have been completed:
* Belly fairing has been completed.
* Belly fairing has been completed.
* Fuselage surface defined.
* Cutouts for doors and windows have been completed.
* Horizontal and vertical stabilizers have taken shape, and work on control surfaces can be started at any time.
* Horizontal and vertical stabilizers have taken shape, and work on control surfaces can be started at any time.
* The basic shape of the wings is done, along with the winglets.
* The basic shape of the wings is done, along with the winglets.
Line 22: Line 22:
'''Exterior:'''
'''Exterior:'''
* Control surfaces are awaiting to be cut.
* Control surfaces are awaiting to be cut.
* Cutouts need to be made on the fuselage for doors and windows.
* Engine nacelles and pylons needed to be created.
* Engine nacelles and pylons needed to be created.
* Fillets and Chamfers will be needed for the joins between the vertical stabilizer and the tail cone.
* Fillets and Chamfers will be needed for the joins between the vertical stabilizer and the tail cone.
356

edits