Airbus A340: Difference between revisions

No edit summary
Line 17: Line 17:
=== Status ===
=== Status ===


As of March 1, 2008, the following items have been completed:
As of June 1, 2008, the following items have been completed:
* Belly fairing has been completed.
* Fuselage surface defined.
* Fuselage surface defined.
* Horizontal and vertical stabilizers have taken shape, and work on control surfaces can be started at any time.
* Horizontal and vertical stabilizers have taken shape, and work on control surfaces can be started at any time.
Line 27: Line 28:


Exterior:
Exterior:
* Belly fairing.
* Control surfaces are awaiting to be cut.
* Control surfaces are awaiting to be cut.
* Cutouts need to be made on the fuselage for doors and windows.
* Cutouts need to be made on the fuselage for doors and windows.
356

edits