=== Status ===
=== Status ===


As of February 1, 2008, the following items have been completed:
As of March 1, 2008, the following items have been completed:
* Fuselage surface defined.
* Fuselage surface defined.
* Upper and lower surfaces of the wings have been defined.
* Horizontal and vertical stabilizers have taken shape, and work on control surfaces can be started at any time.
* Models of passenger doors have been completed.
* The basic shape of the wings is done, along with the winglets.
* Surfaces of horizontal and vertical stabilizers have been defined.


In the cockpit, instruments on the front panel as well as the pedestal have mostly been completed.
In the cockpit, instruments on the front panel as well as the pedestal have mostly been completed.
Line 27: Line 26:


Exterior:
Exterior:
* Belly fairing.
* Control surfaces are awaiting to be cut.
* Cutouts need to be made on the fuselage for doors and windows.
* Cutouts need to be made on the fuselage for doors and windows.
* Engine nacelles and pylons needed to be created.
* Engine nacelles and pylons needed to be created.
* Fillets and Chamfers will be needed for the joins between the vertical stabilizer and the tail cone.
* Flap track fairings.
* Landing gears needed to be created.
* Landing gears needed to be created.
* Wings, horizontal and vertical stabilizers need to be converted into solids before work on control surfaces can begin.


Interior:
Interior: