95
edits
No edit summary |
|||
Line 29: | Line 29: | ||
A third runway is planned in the north of the airport, which is like the other two 4000m long and 60m wide. | A third runway is planned in the north of the airport, which is like the other two 4000m long and 60m wide. | ||
Currently, this project stopped by people decission in Munich on the 17.06.2012. | |||
== ILS == | == ILS == |
edits